Get in Touch with Teng Yang Company
A delivery verification checklist should link each delivery with an approved specification and release decision. Check individual components and the final product. A clean package or one attractive transfer doesn’t warrant the integrity of the lot.
This checklist covers textile DTF printing containing PET film and adhesive powder and compatible ink. UV DTF transfers for hard surfaced items are part of a different process. The two record formats provided in this document are example formats which may be used in conjunction with customer/supplier acceptance agreements to document incoming inspection of materials and aren’t meant to represent test methods or acceptance limits.
DTF materials incoming inspection checklist at a glance
Inspection of material identity and condition of package is a prerequisite to opening the package for further evaluation. The evidence recorded should support the decision made. Evidentiary supports should reflect requirements of the release plan.
Use the DTF Lot Release Dossier as your shared record. The value in the document comes from capturing inspection results and rationale to support a decision to release a lot. Recognize that NIST, in its description of acceptance sampling, refers to lot disposition; it doesn’t provide an estimate of the lot’s quality.
| Check | Evidence to record | Hold or investigate when | Owner |
|---|---|---|---|
| Material identity | Purchase order, grade, revision and supplier lot | Labels or documents disagree | Procurement |
| Delivery condition | Received quantity, package IDs and damage photographs | Seals are broken or stock is damaged | Receiving |
| Film dimensions | Sample position, width/thickness result, units and method | Result misses the agreed limit or its interpretation is unresolved | Quality |
| Film behavior | Feed, printable-side, wetting and peel observations | Approved trial criteria are not met | Production |
| Powder grade | Ordered variant, lot, package condition and specified test evidence | Wrong grade, contamination or unexplained agglomeration appears | Quality |
| Ink readiness | Approved formulation, lot, expiry and handling instructions | Identity, shelf life or preparation cannot be confirmed | Quality |
| Controlled comparison | Retained and incoming sample IDs with process readings | Control fails or incoming result is inconsistent | Production |
| Pending verification | Required durability tests, completion dates and results | A required release condition remains unverified | Quality |
| Final disposition | Released, restricted, held or rejected; quantity, approver and date | Stock has no authorized status | Release owner |
Illustrative entry, not a test result: powder lot P-0929, sample P-0929-B, package seal intact; repeat trial pending; status HOLD; quality lead owns the decision. It’s more relevant to record the inspection as “hold” while a required trial is pending than to mark it “approved” merely because the delivery was on time.
Agree the lot specification and sampling plan before delivery
The receipt of a shipment should be preceded by agreement on the requirement to be verified, the method to be employed, and the interpretation to be made of results. Without these, a supplier may report nominal film thickness while the buyer may measure finished film including its coating, leaving the parties with answers to different questions.
Define the inspection lot. Keep a distinction between various lots of supplier in the same shipment. Define which packages and which positions within those packages will be sampled. Sampling should be done according to the agreed plan, as the lowest or highest sheet in the carton may not adequately represent the shipment.
“the main purpose of acceptance sampling is to decide whether or not the lot is likely to be acceptable”
ISO 2859-1:2026 provides sampling schemes for inspection by attributes. An isolated purchase or short series needs a separate applicability check: ISO 2859-2:2020 addresses isolated lots where switching rules such as those in Part 1 are not applicable. Ask your quality specialist to select the plan. Neither reference supplies one acceptable defect level for every DTF material.
Direct-to-film compatibility belongs in the purchase specification
Attach the approved printer and material combination and revision to the order. The description provided supports evaluation of the combination against the agreed requirements. The film-and-powder compatibility checks help assess the suitability of the film/powder combination.
- Technical data sheet: A vendor technical data sheet (TDS) identifies the product, and defines the properties and limits thereof.
- Lot report: Test results for a particular lot are found in a lot report.
- Safety data sheet: The “safety data sheet” gives directions for safely handling the material.
- Certificate: The “certificate” gives details about the product, the organization and the scope.
Record the acceptance limit and decision rule for each dimension, and agree upon a strategy to be employed if measurement results are near the limit. Missing procurement acceptance criteria should be resolved before booking the stock. Finance needs to be notified about the material for which a production run isn’t yet supported.
Inspect film identification, coating and roll condition
Inspection of the film can reveal conformity to the specified construction and dimensions. Film inspection, however, won’t reveal if the film will accept all printing inks and release coatings. Film inspection will also not reveal if the film is compatible with all of the powders and adhesives used in a combination with heat-transfer.
Match the label to the specified heat-transfer PET film grade. Check the edge of the roll, how it was wound, damage to the core, and the stated print side. Identify where each dimension sample was taken. Determine if a statement on thickness was taken from the base film or the final construction. Compare dimensions to nominal values.
ASTM D8136-24 describes a non-contact capacitance method for film thickness and thickness variability. Its public scope excludes textured, porous and conductive films, including conductive coatings. An antistatic or textured DTF transfer film therefore needs a method-suitability check; a handheld caliper reading is not automatically equivalent to that method.
Borderline measurements deserve a recorded decision, not rounding that favors the delivery deadline. Phillips and Krystek’s NIST-listed paper on conformity decisions explains why uncertainty and decision rules affect acceptance risk. Use the rule agreed for your measurement system; don’t invent a tighter tolerance after the material arrives.
Is thicker DTF film always more stable?
Measuring the film’s thickness doesn’t establish a coating’s overall quality. Release performance, as well as other characteristics, requires evaluation. Just because a roll of film is measured within the agreed upon thickness, doesn’t mean the film is in good condition and won’t cause problems during processing. For example, the film may be damaged, and edges crushed. These defects may prevent the film from being processed. The effects of dimensional measurements are limited to the dimensions checked, and a dimensional result doesn’t mean all defects in a process are acceptable.
Check powder packaging, grade and application behavior
Starting with the ordered grade, inspect powder in batches according to specification to determine if there has been any unwanted change. Received labels should be compared with the approved specification. Powder color or apparently free-flowing powder doesn’t mean the material meets the specification.
Upon receipt, note any seal breaks and/or foreign matter. Check for odd samples that appear to be agglomerated. Review the samples to determine if there has been an unwanted change. Don’t assume an agglomerated sample means it contains excess moisture. If an integrity test is warranted, examine the sample in accordance with the conditions specified by the supplier.
Check the ordered variant against the DTF powder specification; black and white powders serve different product requirements, so appearance alone cannot establish an equivalent replacement.
For this textile DTF process using adhesive powder to effect adhesion, recorded results should address the agreed supplier requirements relating to coating uniformity and a satisfactory bond. Change from prior lots should also be reported.
The Impressions overview of the textile DTF process places powder application within the printing-to-pressing workflow. That process description doesn’t provide your batch acceptance limits. A bag that looks acceptable still needs the verification required by your own approved combination. A supplied ready-to-press transfer can demonstrate a prepared sample, but it can’t replace testing the raw powder lot you received.
Verify ink identity and the approved printer interface
Incoming printer ink isn’t ready for use until the material lot and formulation, including shelf-life, have been approved. Storage and handling of the ingredient prior to use must be evaluated to determine if the integrity of the ingredient has been compromised.
White ink preparation and print quality
Follow instructions from the ink manufacturer to determine whether settled pigment requires redispersion before use. If redispersion doesn’t return the ink to the condition as described by the manufacturer, don’t use the ink and seek further guidance.
An unreadable lot number on a white ink doesn’t permit its use, nor does the existence of a good color test print. If traceable documentation is required to evaluate a bottle for use, Procurement should determine how to obtain it, and/or verify its validity, before permitting its use.
Buyers need to verify the ink formulation for their DTF printer and the associated printhead configuration. Buyers shouldn’t accept a statement that indicates that the ink is “Epson” compatible, or similar broad statements, as proof of compatibility. It’s unsafe to assume that inks from the same manufacturer are compatible with each other. Changeover to the new ink will require following the approved procedure to reduce the risk of printer faults.
Can sublimation ink replace DTF ink?
No change is justified on the basis of both products being textile printing inks. The pigment ink approved for use with your DTF printer should be evaluated. Sublimation printing makes use of a different printing process, and therefore, the printing ink shouldn’t be considered as a trial ink. Teng Yang’s choice of printing film and adhesive powder doesn’t extend approval to the trial ink.
Run the Retained-Lot Swap Test with a known-good control
The Retained-Lot Swap Test compares the incoming lot of raw material with the retained approved lot under a documented setup. The test shouldn’t be relied upon to prove defective chemistry or supplier liability. The test is conducted after confirming the retained combination passes, and then one material should be changed through an approved process.
Record the lot IDs of the film, powder and ink along with the test image, fabric lot, and printer condition. Also record the status of a recent nozzle check, the relevant color profiles, settings for ink application, measured conditions of cure and heat press, and peel timing. A repeatable test image can be used for a number of tests. The image must contain elements such as a gradient, thin lines, company colors, and white coverage on a dark background. CMYK patches and a white underbase may also be included on the test image. When comparing transfers, reference transfers are retained for a reason and comparisons shouldn’t be made on the basis of best color.
Recheck the reference during comparison, especially if the process is showing signs of drift. Take repeat observations based on the agreed trial plan. NIST’s discussion of replication and randomization provides additional information on these experimental methods; its example doesn’t mandate a DTF sample count.
Hypothetical example: approved powder sample P-OLD passes, while incoming sample P-NEW leaves incomplete transfer edges.
| Retained control | Incoming sample | Next action |
|---|---|---|
| Passes | Passes | Continue the agreed lot-release checks; do not erase pending durability tests. |
| Passes | Fails | Hold the incoming lot and repeat the controlled comparison; investigate the material combination. |
| Fails | Fails | Check the process, fabric and retained material before judging the incoming lot. |
| Fails | Passes | Resolve the failed control; a passing new sample does not validate this comparison. |
Hypothetical Example: Record the edges of the incoming transfer being compared and the reference transfers. Comparison results may not be valid if DTF settings aren’t within the approved limits. If the control also deteriorates, investigate DTF settings.
This test is to be conducted through comparison to reference transfers, with DTF settings held within approved limits and the incoming raw materials identified.
Material interactions remain a limitation. NIST explains that one-factor experiments do not reveal interactions. A new powder’s result with one film and ink combination can’t establish its behavior with every combination. Keep detailed powder-curing troubleshooting separate from the receiving decision so adjustments don’t silently redefine the trial.
Separate trial-print approval from durability release
A trial print can evaluate many print quality characteristics, including feed and coverage, and demonstrate behavior of transfer under the printed conditions. Determine what, if any, additional verification is required to allow release against the terms of the purchasing contract. Initial qualification of fabric and other print receivers should be distinguished from lot-for-lot verification and routine testing.
The qualification of a new material combination with the process and substrate of interest should be done prior to incorporating the new material into production. Once a system has been qualified, routine tests on the material may not require further qualification. Claims that one setting of the underbase covers the fabric constructions sold should be validated by testing the constructions of interest.
ISO 6330:2021 specifies domestic washing and drying procedures for textile testing. Its abstract states that a complete test includes both washing and drying, and that equipment and detergent choices can affect results. A report saying only “washed successfully” omits information needed to interpret it.
AATCC TM61 addresses accelerated laundering colorfastness. Its scope shouldn’t be converted into a universal claim about DTF adhesive lifetime. Specify the selected procedure, cycles and evaluation criteria rather than equating an accelerated result with an unsupported number of consumer washes.
- Identify the fabric construction, fabric lot and printed sample.
- Record the prescribed conditioning, washing and drying procedure.
- Consider the agreed-upon accept/reject criteria to assess characteristics such as color change and cracking. Edge lifting, if defined, will also need to be evaluated.
- Retain the before-and-after observations with the result and disposition.
Delayed color change, as well as other cases where end-use requirements dictate testing, should be evaluated using appropriate methods and documented in a manner acceptable to the end user. The absence of completed test results doesn’t warrant a pass.
When is DTF film ready for a bulk order?
Scaling of orders should occur only after the repeat-supply conditions have been approved. A quality gang sheet, for example, may not provide evidence of final transfer performance. The agreed transfer performance verification may not have been performed before a shipment is made. Material may be released for restricted use only if the restriction and the amount released have been clearly documented and authorized in accordance with the conditions established in the user’s procedure. Don’t record a pending test as a pass.
Quarantine nonconforming stock and send a usable supplier claim
In the case of failure to meet requirements, keep affected stock segregated and don’t allow implicated material to be released for production. Keep failed lots separately and provide a record of failure to the user.
- Identity: The name and grade of the material, the lot of supplier, the quantity received, and the quantity affected should be documented.
- Requirement: specification revision, characteristic, method and acceptance rule.
- Observation: Pictures of samples with location identifiers and actual test results should be provided.
- Comparison: retained-control result and recorded process conditions, including departures.
- Disposition request: To request further evaluation or replacement, indicate the responsible owner and the date of the request.
DISCRIMINATE BETWEEN PACKAGE DAMAGE AND A PERFORMANCE TEST FAILURE. A PICTURE OF DAMAGED PACKAGING SHOWS THE CONDITION OF THE PACKAGING, BUT NOT THE CAUSE OF A SUBSEQUENT adhesion FAILURE. ALSO, A SAMPLE FROM A DIFFERENT LOT DOES NOT CLEAR THE BLOCKED INVENTORY.
Keep procurement’s delivery record and production’s sample record connected. Record consumed material and rework separately from stock still on hold. In high-volume production, that distinction helps quantify the affected inventory before requesting replacement. That traceability helps the supplier answer the same question the buyer is asking, without turning an unresolved observation into an accusation. For the process context accompanying a trial, attach the relevant steps from your approved film-and-powder application procedure.
Keep repeat deliveries consistent when materials or settings change
Approval for repeated deliveries is based on the material and process. Also remain current with the sampling criteria and examination standards. Make arrangements to be notified of relevant material or process changes, and evaluate which checks are required before the revised material enters unrestricted production.
Batch control after a process change
Update qualification when changes are made to supplier, when ink or film changes, when equipment and consumables are repositioned, or when the production setup changes. Retain reference samples under their applicable storage conditions, and evaluate the reference itself to determine its fitness for purpose.
Standards references need version control too. The publication of ISO 2859-1:2026 is a reason to review an inspection procedure’s stated edition and applicability, not a reason to silently replace contractual sampling terms.
Process innovation is a separate kind of evidence. WO2025141565A1, a published DTF process and apparatus patent application, lists Kornit Digital Ltd as assignee and describes an integrated arrangement. It isn’t a Teng Yang patent or a quality result for the lot delivered to your warehouse.
Stipulate to Teng Yang the film and powder specifications, the fabric, and lot-document requirements, and agree qualification samples from the relevant product range. Only then, should you accept the bulk shipments.
FAQ: Buyer questions about incoming DTF materials
Can one successful print release an entire material lot?
One sample doesn’t guarantee that all rolls, bags or bottles in the shipment are identical to the printed sample. Nor does it prove that the finished transfer satisfies the specified durability requirements. Release of the lot should be governed by the definitions of lots, sampling plans, and tests and designated actions agreed to prior to shipment. All pending verification should be noted.
Is thicker DTF film always a better incoming result?
As discussed, thickness isn’t an overall quality characteristic. Thickness may be acceptable while coating or feeding defects remain. Thin film may be acceptable. Evaluate the film against specification using agreed upon acceptance criteria, and assess its acceptability to perform the function for which it’s designed when used in combination with qualified ink, powder and transfer conditions.
What should I do if the new lot fails but the retained lot passes?
If the failure is observed during testing, that material should be retained for investigation of the material properties. Describe the test conditions as they were being performed. Take photographs and provide copies of the affected material lot documentation. The supplier should be contacted to review the affected material and decide if further testing is warranted. The stock shouldn’t be released for unrestricted use until the failure is explained and the stock is approved.
Does a certificate replace a receiving test?
Documents serve only to describe the product, lot, method and scope. Relate them to the receiving inspection procedures agreed to for the case in point. A general certification seal doesn’t establish that the delivered lot passes the agreed receiving checks.
Should I test film, powder and ink from new suppliers together?
When changing suppliers, fully qualify the system under test, and perform related comparative tests to assess system performance. Simultaneous uncontrolled changes make attribution of observed results to a particular cause (or causes) difficult.
References & Sources
- NIST/SEMATECH e-Handbook: What is Acceptance Sampling?
- ISO 2859-1:2026: sampling schemes for inspection by attributes; ISO 2859-2:2020: isolated-lot inspection.
- ASTM D8136-24: non-contact capacitance film-thickness measurement, public scope.
- Phillips and Krystek, 2014: Assessment of Conformity, Decision Rules and Risk Analysis, public abstract.
- NIST: One variable at a time; NIST: Full factorial example, replication and randomization.
- ISO 6330:2021: domestic washing and drying procedures, public scope; AATCC TM61: accelerated laundering colorfastness, public summary.
- Impressions: Direct-to-Film custom apparel decorating process overview.
- WO2025141565A1: Direct to film printing process and apparatus.